+91 6391-022737 info@signature-elevator.com Q9GQ+2JF, Fourth Ln, DAV Teacher's Colony, Shahpur, Gorakhpur, Uttar Pradesh 273014

Metro Station

Gorakhpur, Uttar Pradesh Infrastructure Project

Durable and efficient elevators for step-free access and everyday public convenience.

  • Project TypeInfrastructure
  • Elevators Installed6 Units
  • Completion Year2024
  • FloorsConcourse + Platform
Metro Station

Project Overview

Public transport lifts run almost continuously and are used without supervision. Signature Elevator supplied heavy-duty vandal-resistant cars rated for public duty, with remote monitoring back to the operations room.

  • Modern & ElegantElevators with premium finishes that complement the interiors.
  • Smooth PerformanceHigh-performance system for a comfortable vertical ride.
  • Energy EfficientEco-friendly technology to reduce energy consumption.
  • Advanced SafetyEquipped with multiple safety features for passenger protection.
  • Smart Control SystemIntelligent controls for better efficiency and easy operation.
  • Reliable Service24x7 support and maintenance for long-term reliability.

The Challenge

Public installations face constant use, rough handling and an availability target that leaves almost no room for downtime.

  • Meeting a 99.5% availability target.
  • Vandal-resistant fixtures and finishes.
  • Step-free access between concourse and platform.
  • Remote fault reporting to operations.

Our Solution

We installed stainless steel cars with anti-vandal push stations, reinforced glazing and a remote monitoring link that reports faults to the operations room before passengers notice them.

  • High-speed
    Gearless Machines
  • Automatic Rescue
    Device (ARD)
  • Touchless
    Smart Controls
  • Premium SS Hairline
    Cabin Finish
  • LED Lighting &
    Energy Saving
  • Advance Door
    Safety Systems

Elevators Installed

TypeQuantityCapacitySpeed
Public Passenger Lift4 Units1600 kg / 20 persons1.0 m/s
Service Lift2 Units1000 kg0.63 m/s

Client Testimonial

Remote monitoring means we hear about a fault before a passenger reports it. That changed our response times.
Operations ControllerMetro Station

Specifications

Drive SystemGearless PM, VVVF
ControlSimplex with remote monitoring
DoorsAutomatic centre opening, 1100 mm
Cabin FinishSS 304 anti-vandal, reinforced glazing
SafetyARD, intercom to control room
Power Supply3 Phase, 415V, 50Hz

Have a Similar Project?

Let's Build Something Amazing Together!

We provide customized elevator solutions tailored to your
project needs with unmatched quality and service.

GET A FREE QUOTE
Chat on WhatsApp +91 6391-022737